Procurement of 01 (One) 1500 MMS CFD Capacity Custody Transfer Metering Station (CTMS) at Maheshkhali on design & engineering, procurement & supply, installation, construction, testing, pre-commissioning and commissioning (EPC/Turnkey) basis
Status : On-going.

Procurement of 01 (One) 1500 MMS CFD Capacity Custody Transfer Metering Station (CTMS) at Maheshkhali on design & engineering, procurement & supply, installation, construction, testing, pre-commissioning and commissioning (EPC/Turnkey) basis
Status : On-going.

Fabrication and erection of process equipment, piping, steel structure and electrical & instruments under PARTEX Petro Limited.
Status: On-going.

Fabrication and erection of process equipment, piping, steel structure and electrical & instruments under PARTEX Petro Limited.
Status: On-going.

Civil work of engine hall and control building & engine base foundation at Thakurgaon
Status : On-going.

Civil work of engine hall and control building & engine base foundation at Thakurgaon
Status : On-going.

Mechanical fabrication, erection, sandblasting and painting of tanks for Anlima Energy Limited 126.55 MW Power Plant at Kolagaon, Potiya, Chittagong.
Status: On-going.

Mechanical fabrication, erection, sandblasting and painting of tanks for Anlima Energy Limited 126.55 MW Power Plant at Kolagaon, Potiya, Chittagong.
Status: On-going.

Fabrication, erection, installation of piping, instrumentation, hydro testing, sand blasting, painting, two unit tank fabrication & erection, equipment erection EPGL 3000 BPD CRU Project) [ JV].
Status : On-going.

Fabrication, erection, installation of piping, instrumentation, hydro testing, sand blasting, painting, two unit tank fabrication & erection, equipment erection EPGL 3000 BPD CRU Project) [ JV].
Status : On-going.

Insulation & jacking work for the equipment & piping system at partex petro project.
Status: On-going.

Insulation & jacking work for the equipment & piping system at partex petro project.
Status: On-going.

Construction of 42” OD x 1000 psig Gas Transmission Pipeline from North Halisahar to Uttar Salimpur Pig Receiver Station approx. 7.20 km under Anowara -Fouzdarhat Gas Transmission Pipeline Project, Section-D
Status : Completed

Construction of 42” OD x 1000 psig Gas Transmission Pipeline from North Halisahar to Uttar Salimpur Pig Receiver Station approx. 7.20 km under Anowara -Fouzdarhat Gas Transmission Pipeline Project, Section-D
Status : Completed

Mechanical fabrication, erection, sandblasting and painting of tanks for Anlima Energy Limited 126.55 MW Power Plant at Kolagaon, Potiya, Chittagong.
Status: On-going.

Mechanical fabrication, erection, sandblasting and painting of tanks for Anlima Energy Limited 126.55 MW Power Plant at Kolagaon, Potiya, Chittagong.
Status: On-going.